Westward Cottage - Sitting Room

Treatment

Work Completed

In Progress

Stacks Image 214
Walls stripped back where damp.
Pointing removed and replaced.
Completed.
Stacks Image 224
Walls re-skimmed.
Ceiling replaced.
Fireplace stripped back.
Finishing work around skirting boards.
Fireplace surround and mantle to be fitted.
Stacks Image 234
Full electrical re-wire.
Light switches relocated.
Lamp mountings relocated.
Light switches and plates - Jim Lawrence.
Electrical outlets - Jim Lawrence.
Wall lamps - Jim Lawrence.
Underfloor heating to be installed.
Stacks Image 244
Old carpet and underlay removed.
Black slate tiles - Floors of Stone.
Stacks Image 254
Radiator removed.
New radiator to be installed.
Stacks Image 264
Window refurbished.
Rotten French doors replaced - Cherwell Windows.
Finished in Farrow and Ball Plummet.
Front window to be replaced.
Stacks Image 274
Tiles removed from window ledge.
Oak wood treatment to RSJ.
Oak wood fuse box fabricated and installed.
Completed.
Stacks Image 284
Walls prepared for fresh paint.
Walls painted - Farrow and Ball.
Wood trim painted - Farrow and Ball.